Circutor AFQ Series Instrukcja Użytkownika Strona 80

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 106
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 79
AFQ-4W
80 Instruction Manual
Figure 92: Unscrew the turbine fasteners
20.- Replace the turbine with the spare.
21.- Reinsert the pack into the cabinet.
22.- Fix the extractor hood.
23.- Connect the turbine power supply.
24.- Connect the R-S-T phases to the inverter bridge.
25.- Put the NTC probe cable back in the channel.
26.- Connect the NTC probe.
27.- Connect the IGBTs to the driver board and reinstall the driver board if
necessary.
Respect the R-S-T order of the connectors.
28.- Connect the DC bus busbar.
29.- Insert the top crossbar of the AFQ-4W cabinet.
30.- Connect the earth wire to the front panel metal plate of the AFQ-4W.
31.- Fit the protection board.
32.- Check that the turbine operates correctly.
Przeglądanie stron 79
1 2 ... 75 76 77 78 79 80 81 82 83 84 85 ... 105 106

Komentarze do niniejszej Instrukcji

Brak uwag