5.6.12.- Energy generation costs.
The energy generation costs are selected on this screen Figure 125:
The cost per kWh of electricity of tariff 1 generation.
The cost per kWh of electricity of tariff 2 generation.
The cost per kWh of electricity of tariff 3 generation.
The currency.
Figure 125: Energy generation costs conguration screen.
The parameter selected is indicated in white.
The following options appear in the lower area:
● When programming the cost of the tariffs:
, ... The ten possible digits to program.
Comma.
● When programming the Currency:
, ... The possible letters to program.
● For all parameters:
Delete character, deletes the selected character.
Delete parameter, deletes the characters of the selected parameter.
Previous, selects the previous parameter.
140
CVM-B100 - CVM-B150
Instruction Manual
Komentarze do niniejszej Instrukcji