
THREE PHASE STANDARD CIRWATT B METER
CIRWATT B THREE PHASE INSTRUCTION MANUAL
Manipulation of the meter or connections
Activation is delayed by 72 hours to allow for installation
4 kV RMS 50 Hz for 1 minute
1.2/50 ms 0W source impedance
6 kV at 60 ºC and 240 ºC with positive and negative polarity
EN 50470-1 and EN 50470-3
IEC 62052-11, IEC 62053-21
Standards for static, active-energy meters for alternating current,
Class B.
Standards for static, active-energy meters for alternating current,
Class 1.
.
Driven emissions: Class B
Radiated emissions: Class B
Gaps or brief voltage interruptions
Radio-frequency electromagnetic fields
Electrical transient bursts
Alterations driven and induced by radio-frequency fields
Magnetic fields in the grid frequency with an external origin
1.31.- Safety
1.31.1.- Tampering detector
The equipment will generate an event and activate the alarm whenever its cover is lifted. The
alarm can only be deactivated using communications protocols. The minimum time between
two tampering events is 60 seconds.
During the initial startup, the meter will wait 72 hours before generating the first tampering
event in order to avoid its activation whilst the authorized installer is fitting the equipment.
1.31.2.- Protection of the information stored in memory
All access to the meter memory via remote connections is protected by read and write keys.
These keys have more than 4 billion different combinations, granting the meter very strong
protection against attempts to alter the registered information (energy curves, events, billing,
setup).
Komentarze do niniejszej Instrukcji